{"id":134,"date":"2026-09-29T09:42:17","date_gmt":"2026-09-29T09:42:17","guid":{"rendered":"https:\/\/noc.ithj.dk\/kvalitetssikring\/"},"modified":"2026-09-29T12:11:07","modified_gmt":"2026-09-29T12:11:07","slug":"kvalitetssikring","status":"publish","type":"page","link":"https:\/\/nocmarine.dk\/en\/kvalitetssikring\/","title":{"rendered":"Quality Assurance"},"content":{"rendered":"<section class=\"bde-f-container-134-113 bde-f-container nm-article\"><div class=\"bde-f-container-134-112 bde-f-container nm-container nm-rows\"><article class=\"bde-f-container-134-105 bde-f-container nm-row nm-row-lead\"><div class=\"bde-f-container-134-101 bde-f-container nm-row-head\"><h2 class=\"bde-f-text-134-100 bde-f-text nm-row-title\">\nQuality begins with the contract review\n<\/h2><\/div><div class=\"bde-f-container-134-104 bde-f-container nm-prose\"><p class=\"bde-f-text-134-102 bde-f-text nm-prose-p\">\nNOC Marine treats quality as a management discipline rather than a final inspection activity.\n<\/p><p class=\"bde-f-text-134-178 bde-f-text nm-prose-p\">\nBefore engineering or fabrication begins, we identify applicable standards, project specifications, acceptance criteria, hold and witness points, documentation obligations and responsibilities. These requirements are converted into a practical quality setup that the people carrying out the work can understand and follow.\n<\/p><p class=\"bde-f-text-134-103 bde-f-text nm-prose-p\">\nThe complexity of that setup is proportionate to the risk and scope. A straightforward fabricated support does not need the same control regime as offshore secondary steel or work for a regulated production facility. Our task is to apply the necessary level of control without creating paperwork that is disconnected from the product.\n<\/p><\/div><\/article><article class=\"bde-f-container-134-111 bde-f-container nm-row\"><div class=\"bde-f-container-134-107 bde-f-container nm-row-head\"><h2 class=\"bde-f-text-134-106 bde-f-text nm-row-title\">\nQA\/QC throughout fabrication\n<\/h2><\/div><div class=\"bde-f-container-134-110 bde-f-container nm-prose\"><p class=\"bde-f-text-134-108 bde-f-text nm-prose-p\">\nFor production in Lithuania, NOC Marine coordinates quality directly with the selected supplier. Activities may include review of quality plans and inspection and test plans, verification of material certificates, identification and traceability, welding procedure and welder qualification review, dimensional inspections, visual welding inspection, NDT coordination, coating inspection and systematic handling of non-conformities.\n<\/p><p class=\"bde-f-text-134-109 bde-f-text nm-prose-p\">\nQuality information is gathered as production progresses. This allows gaps or inconsistencies to be corrected while the relevant material, personnel and process information is still available. It also gives project management a more reliable view of actual completion: a component is not considered complete merely because fabrication has ended; the required inspections, records and release activities must also be in place.\n<\/p><div class=\"bde-f-container-134-154 bde-f-container nm-chips-block\"><p class=\"bde-f-text-134-134 bde-f-text nm-chips-label\">\nQA\/QC activities\n<\/p><ul class=\"bde-f-container-134-153 bde-f-container nm-chips\"><li class=\"bde-f-container-134-136 bde-f-container nm-chip\"><div class=\"bde-f-text-134-135 bde-f-text\">\nQuality plans and ITPs\n<\/div><\/li><li class=\"bde-f-container-134-138 bde-f-container nm-chip\"><div class=\"bde-f-text-134-137 bde-f-text\">\nMaterial certificates\n<\/div><\/li><li class=\"bde-f-container-134-140 bde-f-container nm-chip\"><div class=\"bde-f-text-134-139 bde-f-text\">\nTraceability\n<\/div><\/li><li class=\"bde-f-container-134-142 bde-f-container nm-chip\"><div class=\"bde-f-text-134-141 bde-f-text\">\nWelding procedures and qualifications\n<\/div><\/li><li class=\"bde-f-container-134-144 bde-f-container nm-chip\"><div class=\"bde-f-text-134-143 bde-f-text\">\nDimensional control\n<\/div><\/li><li class=\"bde-f-container-134-146 bde-f-container nm-chip\"><div class=\"bde-f-text-134-145 bde-f-text\">\nVisual weld inspection\n<\/div><\/li><li class=\"bde-f-container-134-148 bde-f-container nm-chip\"><div class=\"bde-f-text-134-147 bde-f-text\">\nNDT\n<\/div><\/li><li class=\"bde-f-container-134-150 bde-f-container nm-chip\"><div class=\"bde-f-text-134-149 bde-f-text\">\nCoating inspection\n<\/div><\/li><li class=\"bde-f-container-134-152 bde-f-container nm-chip\"><div class=\"bde-f-text-134-151 bde-f-text\">\nNon-conformance management\n<\/div><\/li><\/ul><\/div><\/div><\/article><\/div><\/section><section class=\"bde-f-container-134-116 bde-f-container nm-pull nm-pull-wide\"><div class=\"bde-f-container-134-115 bde-f-container nm-container nm-pull-inner\"><blockquote class=\"bde-f-text-134-114 bde-f-text nm-pull-text\">\nA component is not considered complete merely because fabrication has ended.\n<\/blockquote><p class=\"bde-f-text-134-179 bde-f-text nm-pull-cite\">\nQuality Assurance\n<\/p><\/div><\/section><section class=\"bde-f-container-134-133 bde-f-container nm-article nm-article-alt\"><div class=\"bde-f-container-134-132 bde-f-container nm-container nm-rows\"><article class=\"bde-f-container-134-121 bde-f-container nm-row\"><div class=\"bde-f-container-134-118 bde-f-container nm-row-head\"><h2 class=\"bde-f-text-134-117 bde-f-text nm-row-title\">\nWelding control\n<\/h2><\/div><div class=\"bde-f-container-134-120 bde-f-container nm-prose\"><p class=\"bde-f-text-134-119 bde-f-text nm-prose-p\">\nWelded structures are managed against the applicable execution standard, customer specification and drawing requirements. The quality plan defines how procedures, qualifications, consumables, joint preparation, preheat or interpass controls, inspection and acceptance criteria are handled. NOC Marine coordinates technical clarification where drawings and fabrication conditions do not align, preventing workshop improvisation from becoming an undocumented design change.\n<\/p><\/div><\/article><article class=\"bde-f-container-134-126 bde-f-container nm-row nm-row-dark\"><div class=\"bde-f-container-134-123 bde-f-container nm-row-head\"><h2 class=\"bde-f-text-134-122 bde-f-text nm-row-title\">\nCoating and corrosion protection\n<\/h2><\/div><div class=\"bde-f-container-134-125 bde-f-container nm-prose\"><p class=\"bde-f-text-134-124 bde-f-text nm-prose-p\">\nCoating performance depends on far more than the final dry-film thickness. Surface preparation, environmental conditions, stripe coating, application intervals, repairs and inspection records all contribute to the result. NOC Marine can coordinate review of the specified coating system, monitor surface preparation and application, verify inspection results and compile coating documentation. For marine and offshore deliveries, this control is an essential part of lifecycle performance.\n<\/p><\/div><\/article><article class=\"bde-f-container-134-131 bde-f-container nm-row\"><div class=\"bde-f-container-134-128 bde-f-container nm-row-head\"><h2 class=\"bde-f-text-134-127 bde-f-text nm-row-title\">\nDocumentation and handover\n<\/h2><\/div><div class=\"bde-f-container-134-130 bde-f-container nm-prose\"><p class=\"bde-f-text-134-129 bde-f-text nm-prose-p\">\nThe final manufacturing documentation is defined at project start and built continuously. Depending on the scope, it may include material certificates, traceability records, welding documentation, NDT reports, dimensional reports, coating records, calibration evidence, deviation records, inspection releases and as-built information. Documents are reviewed for completeness and consistency before handover, reducing the risk of a physically complete delivery being delayed by an incomplete dossier.\n<\/p><div class=\"bde-f-container-134-177 bde-f-container nm-chips-block\"><p class=\"bde-f-text-134-155 bde-f-text nm-chips-label\">\nThe handover package may include\n<\/p><ul class=\"bde-f-container-134-176 bde-f-container nm-chips\"><li class=\"bde-f-container-134-157 bde-f-container nm-chip\"><div class=\"bde-f-text-134-156 bde-f-text\">\nMaterial certificates\n<\/div><\/li><li class=\"bde-f-container-134-159 bde-f-container nm-chip\"><div class=\"bde-f-text-134-158 bde-f-text\">\nTraceability records\n<\/div><\/li><li class=\"bde-f-container-134-161 bde-f-container nm-chip\"><div class=\"bde-f-text-134-160 bde-f-text\">\nWelding documentation\n<\/div><\/li><li class=\"bde-f-container-134-163 bde-f-container nm-chip\"><div class=\"bde-f-text-134-162 bde-f-text\">\nNDT reports\n<\/div><\/li><li class=\"bde-f-container-134-165 bde-f-container nm-chip\"><div class=\"bde-f-text-134-164 bde-f-text\">\nDimensional reports\n<\/div><\/li><li class=\"bde-f-container-134-167 bde-f-container nm-chip\"><div class=\"bde-f-text-134-166 bde-f-text\">\nCoating records\n<\/div><\/li><li class=\"bde-f-container-134-169 bde-f-container nm-chip\"><div class=\"bde-f-text-134-168 bde-f-text\">\nCalibration certificates\n<\/div><\/li><li class=\"bde-f-container-134-171 bde-f-container nm-chip\"><div class=\"bde-f-text-134-170 bde-f-text\">\nNon-conformance records\n<\/div><\/li><li class=\"bde-f-container-134-173 bde-f-container nm-chip\"><div class=\"bde-f-text-134-172 bde-f-text\">\nInspection releases\n<\/div><\/li><li class=\"bde-f-container-134-175 bde-f-container nm-chip\"><div class=\"bde-f-text-134-174 bde-f-text\">\nAs-built documentation\n<\/div><\/li><\/ul><\/div><\/div><\/article><\/div><\/section>","protected":false},"excerpt":{"rendered":"<p>Kvalitet begynder ved kontraktgennemgangen NOC Marine behandler kvalitet som en ledelsesdisciplin og ikke som en afsluttende inspektionsaktivitet. F\u00f8r engineering eller fabrikation begynder, identificerer vi g\u00e6ldende standarder, projektspecifikationer, acceptkriterier, hold- og witness points, dokumentationsforpligtelser og ansvar. Kravene oms\u00e6ttes til et praktisk kvalitetssetup, som de udf\u00f8rende kan forst\u00e5 og f\u00f8lge. Kompleksiteten tilpasses risikoen og opgavens omfang. En [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":36,"parent":0,"menu_order":40,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","footnotes":""},"class_list":["post-134","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/pages\/134","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/comments?post=134"}],"version-history":[{"count":7,"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/pages\/134\/revisions"}],"predecessor-version":[{"id":250,"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/pages\/134\/revisions\/250"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/media\/36"}],"wp:attachment":[{"href":"https:\/\/nocmarine.dk\/en\/wp-json\/wp\/v2\/media?parent=134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}